#1 Best Seller in Cladding Trims

WHITE Hygienic Cladding Division bar (1part)

From £6.65 (ex. VAT)
From £7.98 (inc. VAT)

need it Thursday? order within

  • PVC DIVISION BAR or jointing trim (1 PART)
  • Available in 8ft (2.4mtr) or 10ft (3.05mtr) lengths
  • Can be used with our 1.5mm, 2mm, 2.5mm or 3mm thick sheets
  • Class1 fire rated | food grade
  • To form a perfect seal or joint between two sheets

*Our best selling division bar

Useful Links

Tutorials
Downloads

Our Cladding System

click image below to view

Application of use – forms a anti-bacterial seal between 2 sheets. Fix your hygienic cladding sheet to the wall then slot one side of the Cladding Centre division bar into the sheet. Take next wall cladding sheet and push into division bar. Please leave around 2mm expansion gap in either side of Division bar.

SUITABLE for WHITE 1.5mm | 2mm | 2.5mm and 3mm thick cladding sheets. Not suitable for the 3mm Budget sheet (use 2 part)

 

Colour

White

Sizes Available

8ft (2.4mtr) or 10ft (3.05mtr)

Fire Rating

Class 1 British Standard 476 Part 6/7

Technical Data Sheets

Delivery

Cladding Monkey offers a competitive and reliable delivery service. We can offer a delivery service to suits your needs which includes a economy 5-7 working day service, 2-3 day service and a next working day service. Prices are shown below.

OPTION1: Economy Delivery

£25+vat for ANY quantity, excludes colours and budget sheets. Is delivered on one of our fleet of vehicles and takes around 5-7 working days. Excellent value for money if time scale is not critical. You will receive a phone call the day before to book your delivery in.

OPTION2: 2-3 Day Delivery

Depending on value of goods, see chart below. Depending on value of goods, see chart below.

Purchase ValueDelivery Cost
£1 – £100£30+vat
£100 – £200£40+vat
£200 – £350£50+vat
£350 – £2000£80 +vat *Pallet delivery (£15 surcharge for any 10ft item added)
£2000+£85+vat * Pallet delivery (£20 surcharge for any 10ft item added)

OPTION2: Next Day Delivery

For all orders placed before 12noon for next working day delivery

Purchase ValueDelivery Cost
£1 – £200£65+vat
£200 – £300£75+vat
£300+£95+vat *Pallet delivery (£20 surcharge for any 10ft item added)

Delivery Times

Delivery times are between 8.00am & 6.00pm. Unfortunately, we cannot offer you an estimated time of arrival as we use a courier/pallet courier to deliver the goods if outside our area. If there is the likelihood of delay or we are unable to fulfil an agreed delivery date, we will contact you in advance to discuss alternative options. Any missed deliveries will incur a re-delivery charge. We have developed a very reliable carrier delivery service but it is possible due to unforeseen circumstances that an order may not reach its destination within the stated time frame, for this reason we strongly advise against booking installers until your goods have arrived, we cannot be held liable for any consequential loss and cannot be held responsible. This applies also to next day deliveries if for some unforeseen reason does not turn up on the day stated, no refunds will be given. By placing your order and selecting a delivery charge you agree to these conditions.Please make us aware of any issues as soon as possible. Any goods refused at time of delivery, that are found undamaged once returned, will be charged for their return to the warehouse. We strongly advise you not to book installers until your hygienic cladding or accessories has arrived and you have checked it as we cannot be held liable for any consequential loss.

Delivery Considerations

Following insurance guidelines, all pallet deliveries are curb-side drops and you must have at least two able bodied people to offload your order. Drivers are NOT insured to offload into your place of work or site. Smaller orders will be sent via TUFFNELS and the driver will bring the order to your door.Before signing for goods, upon arrival check all parts of the order to ensure it has arrived in full and check for any damage during its transit. In the rare occurrence there is damage or missing items with your order, you must sign the delivery note as ‘damaged’ or “missing”and explain to what extent, if you then contact us we will look to replace damaged/missing items as soon as you make us aware. Please note as with any delivery, if you sign the delivery note that you received the goods in good order we cannot then replace any damaged/missing packs packs after this stage.Special access requirements should be outlined at the time of your order, if you have any restricted access such as size, weight or parking limitations or for any reason that an arctic sized wagon cannot reach your address you must inform us at the time of order so we can make arrangements for this. Any failed delivery on this basis will incur a re-delivery charge.Any goods which are refused at the time of delivery and upon receipt back to us are shown to not contain faults or damages will be given a refund less the delivery costs.At Cladding Monkey we work with the most reliable couriers to ensure delivery standards are maintained, although nearly all our deliveries arrive on time, none of our services are guaranteed due to potential delays such as traffic and weather and as such we strongly advise not to book installers or other work until your delivery arrives as we can not be held liable for any consequential loss.No liability can be accepted for costs caused by late deliveries or for any other reason. Therefore we advise against booking trades for installations until goods have been receivedPrior to use, please ensure that you inspect your goods prior to installation and that the goods are correct as per your order and that you are happy with the appearance and quality. Once the installation has started no claims for incorrect goods will be accepted. It is also the responsibility of the person installing your hygienic wall cladding to de-select any faulty or damaged boards prior to the installation as no claims for faulty of damaged boards can be accepted after the installation.

Damaged Faulty Goods

Any damaged goods MUST be signed as damaged on the delivery note; we will then make further arrangements with you to replace the damaged goods. If you are not happy with replacements to be sent out you may return the goods (at your own cost) and we will arrange a FULL refund within 7 working days.

Cancellations and Returns

You can return your order  providing it is in resalable condition. Returns must be accepted and booked in using our returns policy and procedure (please email us for a returns form) This gives you adequate time to check your order and inform us of your wish to return. Resalable condition will be checked when the order is returned. ALL RETURNS ARE THE RESPONSIBILITY AND EXPENSE OF THE CUSTOMER. All cancellation requests must be emailed to sales@claddingmonkey.co.uk

Pallet

All pallets must be removed along with the hygienic cladding sheets and kept by the customer for all pallet deliveries. Following insurance guidelines, all pallet deliveries are curb-side drops and you must have at least two able bodied people to offload your order. Drivers are NOT insured to offload into your place of work or site. Smaller orders will be sent via TUFFNELS and the driver will bring the order to your door.

Installation Tutorials

Cladding installation is easy. Take a look at our short video with a thorough guide on how to install our hygienic wall cladding.





Individual Tutorial Video Clips



Step 1 – Tool Selection

Welcome to the Cladding Monkey installation guide. Before starting, let’s gather all the tools needed:

  • Tape measure
  • Jigsaw
  • Hacksaw
  • Rubber mallet
  • Marker pen
  • Combination square
  • Laser level or spirit level
  • Mixing device & 4mm notched trowel If you plan to use the 2-part adhesive
  • Wipes
  • Application gun
  • Adhesives & silicones
  • Work table



Step 2 – Surface Preparation

24hrs before starting work apply watered-down PVA solution to the wall, so all particles are completely removed, allowing you to install PVC cladding onto a clean surface.



Step 3 – Setting Level

The capping and transition base should align at the bottom of the wall and sit on either the floor, skirting or worktop – use a laser level or spirit level to ensure this is the case.

The decision to cut the sheets will depend on the total height of the ceiling.

Using the single part adhesive, place the trim on the predetermined level, then use your hand to apply pressure.

Use masking tape to hold the profile in place, then leave it for as the duration stated on the adhesive.



Step 4 – Measuring Cuts

Measure the cladding area and mark the final placement for each sheet from sockets to switches to pipes.

If corners fall within the cladding area, for sheets to fit they may need to be adjusted – check the levels of the walls to check if this is the case.

Remove part of the film from around the edge of the sheet, so it doesn’t become trapped in the profiles when fitted.

When cutting the sheet, firmly hold down the sheet, as when using a jigsaw, excess vibration could cause it to break.



Step 5 – Adhesive Preparation

There are 2 different adhesives, used to stick the sheet to the wall, for 2 different situations:

  • For full coverage the two-part adhesive is recommended
  • For quick installations the cartridge adhesive is recommended, for internal or external use

When working with the two-part adhesive, mix solutions a and b with a drill fitted mixing paddle. Mix for at least 2 minutes for an even consistency.



Step 6 – Adhesive Application

Using a four mm notched trowel, spread the mixture evenly over the non-filmed side of the sheet. 

But remember – to allow for the 2 part joining strips – leave a 15mm gap around the sheet’s outer edge.

When working with the cartridge adhesive, this will also be applied to the non-filmed side of the sheet, but this time, use an application gun.

We would always advise to apply lines of adhesive as shown.



Step 7 – Fitting Sheets

Make sure the board and wall is dust, dirt, oil & debris free before applying the adhesive. Always use the sealant in horizontal lines as vertical lines makes it tougher for the adhesive to stick.
Always ensure even coverage across the whole board.

There are 2 main roles in this process;

The first focussed on guiding the sheet into the base trim 

And the second focussed on holding the sheet away from the wall.

Preferably you will have 2 people present – one to handle each role.  If this isn’t possible you can always use some glass suction cups, to easily position the sheet. 

The sheet should only be pushed against the wall, once it’s been fitted into its base trim. It’s crucial that the sheet is correctly placed before it’s smoothed over with your hand or a rubber mallet to fully spread the adhesive. This is because the two-part adhesive dries very quickly.



Step 8 – Fitting Accessories

Due to their sensitivity to temperature, PVC materials may expand and contract marginally once fitted.

This is why a 2mm expansion gap between the cladding sheet and the centre of the two-part vertical joiner is pivotal. 

If the sheets require cutting, the two part vertical joiner will also require cutting.

Fit these using a small bead of adhesive and slide behind the sheet.

Please refer to our profiles information sheet on our website for information of the two corner choices available – both of which are offered in different sizes.

In short, the first type is an internal or external 90 degree angle – simple to use and cut, with the ability to be stuck to the wall with adhesive.

The second being an internal and external corner section – clip the chosen corner piece onto the next sheet to go on the wall once the sheet has been fitted up to said corner.

Then run a bead of adhesive down the edge of the previously fitted one, before joining this next sheet up to it and fit onto the wall.

In order to fill any minor gaps which may present themselves, you can use our food grade silicone.

Next, trim the join of fronts and transition tops with a hacksaw. Then remove the protective film and clip the relevant join of fronts into place.

The cladding can now be wiped down.


If any further support if needed, do not hesitate to contact our team on 01642241777 or download our detailed hygienic cladding installation guide.


Installation Guide




Installation Guides

In this section you will find PDF files containing official technical data and information for all our products. If there is specific information you require that isn’t on our website, then please contact us.

Ranges

U-PVC Sheets Satin Range

Sheet Range

Profile Range

Adhesive Range

Silicone Range

Cleaning Guide

Colour Guide

Adhesive Comparison Guide

Adhesive Range Overview

Installation Guide